Building a mining-oriented integrated energy system capable of harvesting and reusing multiple resource flows represents a cornerstone tactic for propelling the mining sector toward its twin carbon abatement milestones. The safe, high-efficiency dispatch of such a system hinges fundamentally on precise load anticipation. Current scholarship, by and large, decouples the forecasting problem from its scheduling aftermath, treating the two as siloed domains; this separation habitually gives rise to steep rescheduling penalties whenever predictions miss the mark. Seeking to bridge this divide, we put forward a closed-loop load forecasting framework that weaves in both the cost of rescheduling and the asymmetry inherent in prediction errors. A data-generation and model-specification procedure is first described, mapping real load readings, projected values, and incurred rescheduling costs to capture the latent dependency structure tying forecast deviation to economic penalty. Given that shortfalls and surpluses impinge on dispatch outcomes in fundamentally different ways, the cost model is then fused with an asymmetric treatment of forecast residuals to shape the objective function of a Bi-LSTM forecaster. A self-calibrating mechanism for blending coefficients that weight asymmetric errors is further engineered to preserve predictive fidelity. The framework is trialed on the power-load forecasting task of an integrated energy installation at a Shanxi coal mine. Findings attest to the framework's capacity to dampen rescheduling outlays without sacrificing forecasting exactitude, spotlighting its latent utility for electrical load forecasting in mining-grade integrated energy systems.